Project Type: Groundwater Remediation—Trenching
Other: This groundwater remediation project required
a trenching machine equipped with a spoil deflector plate and aggregate
feeder hopper. IBI excavated a 12-inch wide trench and laid corrugated
PE drainpipe with filter stock. The project was backfilled with controlled
grading of granular material in one operation.
|